For this renovation project, Razel-Bec re-laid all the paving in the square, retaining the grid of black and white stripes. A line of fifteen mini-fountains were installed to replace the various old malfunctioning ones.
Discover our major projects
18/11/2024
Installation of the tunnel boring machine on line 17 of the Grand Paris Express