Built on the site of the Bugey power plant in Ain, this nuclear facility was commissioned by EDF to receive, condition and store radioactive metal waste. As leader of the consortium that won the contract, Razel-Bec was responsible for the design work, followed by construction and testing before commissioning, subject to authorisation from the French Nuclear Safety Authority (Autorité de Sûreté Nucléaire).